May, 2013 Luncheon
Speaker: Beth Howey of HDR Engineering, Inc.
Date: Thursday, May 16, 2013
Topic: Bonner Bridge - History and Replacement Structure Foundation Design Aspects
Download: Presentation, MP4 #1 | AVI #1, MP4 #2 | AVI #2
Summary: The replacement of the 50-year-old Bonner Bridge has been studied for over 20 years and the presentation provided a brief glimpse of the history of the bridge as well as some of the foundation design aspects the Design Build team tackled in working on the replacement structure.